| | odrich power
Career History:
| Title |
Signalling Designer |
Mar/08 – Working |
| Company |
Network Rail, Croydon, Surrey, UK |
|
| Key Achievements: |
Produced Correlation and Signalling Design Specification for five TPWS incorporation project for Anglia Region (UK)
Produced Scheme Design Works for TPWS Programme
Produced TPWS detailed circuit design for five different locations (Signals)
Successfully completed PgD in Railway Infrastructure Engineering from Sheffield Hallam University, UK
|
|
| Title |
Lead ATE Project Engineer |
Feb/07 – Feb/08 |
|
Company |
Goodrich Power Systems, Pitstone Green, Bucks, UK |
|
| Key Achievements: |
Proposed new Falcon ATE & raised £130k capital expenditure
Identified all test requirement specifications Falcon Programme and written incomplete ones
Recommended in writing alternative test techniques that will save the Operation £3000 per ship t in comparisons to the current tests
Currently undertaken design activities that involves designing high current (1kA @28Vdc) switching hardware based on Solid-State topology
|
|
| Title |
Test Equipment Development Engineer |
Jun/04 – Sept/06 |
| Company |
|
|
| Key Achievements: |
Designed Multi-leaf Collimation (MLC) test system using MOSFET topology
Designed and build halogen lamp ageing test equipment within given deadline
Investigated on Dose measurement module facility (Ion chamber) and recommended the possible cause which has already shown significant improvement
Tested (including fault finding) of 6MV, 10MV, 15MV and 25MV XRAY linear accelerator system
Tested (including fault finding) of 4MeV to 18MeV energy Electron system
|
|
| Title |
High Power RF Test Team Leader |
Jul/03 - Apr/04 |
|
Company |
Thales Communications Ltd, West Sussex, UK |
|
| Key Achievements: |
Acquired various products knowledge including high power Transceivers (Up to 5kW RF power) which are widely used in Air Traffic Control and Naval Communications
Developed a production test process that already achieved significant test efficiency against last years
Developed Skills matrix, Work to do List and Test Faults register database
Key Performance Indicators (KPI) on Delivery accuracy, Test efficiency and Test fault analysis
|
|
| Title |
RF Development Engineer |
Sep/01 – Feb/03 |
| Company |
Nokia Networks, Surrey, UK |
|
| Key Achievements: |
GSM900, 1800 and 1900, Edge and WCDMA Transceivers verified from design & manufacturing point of view within the given time scale
Sixteen externally manufactured EDGE duplex filters verified within three weeks deadline
Investigated into potential yield improvement and presented the findings to the plant management and Nokia Finland. The recommendations were implemented immediately into action to the production line
|
|
| Title |
Radar Sub-Systems Integration Engineer |
Jan/01 – Aug/01 |
| Company |
TMD Technologies Ltd, Middlesex, UK |
|
| Key Achievements: |
Tested -15kVdc switch mode power supply unit from component level and systems level
Integrated X-band Travelling Wave Tube (TWT) with -15kVdc PSU in CW and Pulsar mode
Engineered an altitude test controller prototype for altitude tester, which was used as interlocks and monitoring purpose. The prototype was reduced significant test time and increased safety
|
|
| Title |
Test Equipment Development Engineer |
Jun/95 – Aug/96 |
|
Company |
GEC Henley Ltd, Kent, UK |
|
| Key Achievements: |
Assigned to manage a project which involves developing an Impulse Generator.
Designed and built an Impulse Generator to BS7657
Successfully commissioned and validated
Liaised and negotiated directly with supplier to purchase parts and components
|
|
| | |
|